top of page

The Work Begins!

After nearly 4 months of the TradeWind resting in the driveway next to the old barn I finally got around to beginning the project. The first steps can sometimes be the hardest. Started late in the day. Tore out of the old gaucho/couch and nasty carpet up to where the bedroom begins. Junked the old curtains and shelf. Finally got a good look at the water tank and pump. Probably will need to replace both. Other sour news was the condition of the sub-floor. Bunch of rot as pretty much expected. Was not surprised by this. Looks like I will be removing all interior and putting in a new sub floor. Imagine there will be other add-ons to the job as a result of this. No worries. Feels good to finally get working on this gem.


Featured Posts
Check back soon
Once posts are published, you’ll see them here.
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page